Variable Head Permeability Test
1. Compile data collected from spreadsheets on and uploaded document.
3. Calculate hydraulic conductivity (cm/sec) and estimate various means (arithmetic, geometric, and harmonic) and the standard deviation.
4. Draw a duration curve on a probability paper and estimate the 10% and 90% expected values.
5. Discuss any sources of errors.
Provide a word document and the excel spreadsheet with the formulas used with the data available to check.