Future Plan

Based on the background information provided below to write a future plan/ action plan for implementing Global Communication Based Train Control (CBTC)
System into the NYC subway system across 5 boroughs. NYC has 5 boroughs. Please read the background information first since the future plan should be
after that.
The action plan should include the answers for the following questions:

  1. Future Plan
    -How the proposed solution: implementing Global Communication Based Train Control (CBTC) System into the NYC subway system would solve the safety
    problem in NYC subway system(a train derailed at 125th Street due to the emergency brake’s failure)
    -How the proposed solution: implementing Global Communication Based Train Control (CBTC) System into the NYC subway system would solve the
    efficiency problem (frequent delays)
    --How the proposed solution: implementing Global Communication Based Train Control (CBTC) System into the NYC subway system would solve the
    efficiency problem(lower labor cost)
    -How the proposed solution: implementing Global Communication Based Train Control (CBTC) System into the NYC subway system would support
    GDP/creating employment
  • How the proposed solution could address the issue of race and equity. The subway is often used by middle- and lower-income population of residents.