Cost overrun is an unexpected change in the project budget

Cost overrun is an unexpected change in the project budget that ends up increasing the total
project cost. There are many well-known construction projects around the world ended up with
cost overrun such as;
• Scottish Parliament,
• Wembley stadium,
• Metro Dubai,
• British Library, and
• Jubilee line (London underground)
Write 750 words about one of the mentioned projects with addressing an overview of the project
and the causes that led to cost overrun (15 points). Then prepare a power point presentation that
shows the most significant facts about your chosen project 5 points)